Neelkanth Contruction Private Limited Summary of Past Experience | |||||||
DEEP EXCAVATION | |||||||
S.no | Project | Client | location | Nature of work | Contract Value (millions) | Contract Duration | Year of Commencement |
1 | The Design & Construction of two underground Stations and tunnel between New Delhi Station and Talkatora Garden"AMEL-C1'. | Alpine Samsung HCC JV | Delhi | Earthwork at Shivaji Stadium - AMEL C1 DMRC PH II | 27.98 | 19 Months | 2008 |
2 | The Design & Construction of two underground Stations and tunnel between New Delhi Station and Talkatora Garden"AMEL-C1'. | Alpine Samsung HCC JV | Delhi | Earthwork at C&C Section Talkatora - AMEL C1 DMRC PH II | 21.22 | 13 Months | 2009 |
3 | The Design & Construction of two underground Stations and tunnel between New Delhi Station and Talkatora Garden"AMEL-C1'. | Alpine Samsung HCC JV | Delhi | Road Works at Mundka Segment Factory - AMEL C1 DMRC PH II | 25.2 | 2 Months | 2009 |
4 | Design and construction of 2.6 km long NATM tunnel between Talkatora Garden and Budha Jayanti Park 'AMEL-C6'. | Alpine HCC JV | Delhi | Backfilling of Shaft 3 and Cut and Cover Tunnel - AMEL C6 DMRC PH II | 6.88 | 12 Months | 2009 |
5 | The Design & Construction of two underground Stations and tunnel between New Delhi Station and Talkatora Garden"AMEL-C1'. | Alpine Samsung HCC JV | Delhi | Road Repairing at Shivaji Stadium Station | 0.27 | 3 Months | 2008 |
6 | Design and Construction of Tunnel by shield TBM and Janpath House stations by Cut and Cover method Central Secretariat And Mandi House for underground works under Delhi MRts Project & Mandi | Pratibha-CRFGJV | Delhi | Earthwork Excavation and its disposal from Mandi House Station | 59.6 | 12 Months | 2012 |
7 | Design and Construction of Tunnel by shield TBM tunnel Stations and Ramp by cut and cover method between Motibagh and Lajpat nagar Stations for CC-18 | FEMC-Pratibha JV | Delhi | Excavation Work in Bhikaji Cama Place And Sarojni Nagar,along with TBM muck disposal | 180.6 | 18 Months | 2013-14 |
8 | Design & Construction of Tunnel from Design End of underground ramp(Near Shankar Vihar Metro Station) to hauz khas metro station and underground ramp near shankar vihar metro station and underground metro station at Vasant Vihar, Munirka, R.K.Puram, Iit and Hauz Khas for CC- 27 | L&T-SUCG | Delhi | Excavation Work in IIT,RK Puram and Munirka Station | - | 2 Months | 2013 |
9 | Design and Construction of Tunnel by shield TBM and station by Cut and Cover method Kashmere Gate for underground works under Delhi MRts Project | ERA-METROSTOY | Delhi | Excavation Work In KASHMERE GATE | 65 | 2.5 Months | 2013 |
HIGHWAY | |||||||
1 | Four Laning of Indore Ujjain Highway in the State of Madhya Pradesh | Galfar Engineering & Contracting (India) Pvt. Ltd. | Indore(M.P.) | Earth work in filling including borrow area operations | 15.2 | 8 Months | 2011 |
2 | Four Laning of Ghaziabad Aligarh Section of NH 91 in the state of Uttar Pradesh | PNC Infratech Ltd. | Ghaziabad(U.P.) | Earth work upto JSB Level | 51.5 | 6 Months | 2011 |
3 | Four Laning of Ghaziabad Aligarh Section of NH 91 in the state of Uttar Pradesh | Galfar Engineering & Contracting (India) Pvt. Ltd. | Aligarh(U.P.) | Construction of Embankment and Sub-grade including clearing and grubbing | 23.5 | 6 Months | 2011 |
4 | Four Laning of Ghaziabad Aligarh Section of NH 91 in the state of Uttar Pradesh | Galfar Engineering & Contracting (India) Pvt. Ltd. | Aligarh(U.P.) | Transportation of DBM, WMM, GSB & BC to site | 0.11 | 1 Month | 2011 |
HIRING | |||||||
S.no | Project | Client | location | Name of Machinery | |||
1 | The Design & Construction of two underground Stations and tunnel between New Delhi Station and Talkatora Garden"AMEL-C1'. | Alpine Samsung HCC JV | Delhi | Mini concrete mixer, Tata Hitachi Ex- 70,110,200 | |||
2 | BC-24 Design and Construction of underground metro construction with advanced tunnel boring machines on theCentral Secretariat – Badarpur Corridor of Delhi MRTS | ITD-ITD CEM JV | Delhi | Tata Hitachi- Ex 70 | |||
3 | Signature Bridge Project | Gammon India Limited | Delhi | Tata Hitachi- Ex 70 | |||
4 | Design & Construction of Ramp , Tunnel and 4 underground Stations | J. Kumar Infraprojects. Ltd. | Delhi | JCB Back Hoe Loader, Tata Hywa, Tata Hitachi Ex-200 | |||
5 | Design & Construction of Tunnel by shield TBM tunnel stations and Ramp bu cut and cover mathod between Hauz Khas and Kalkaji Stations for Underground Works for CC-23 | FEMC-Pratibha JV | Delhi | Tata Hywa | |||
SUPPLY | |||||||
S.no | Project | Client | location | Name of Material | Price | ||
1 | BC-24 Design and Construction of underground metro construction with advanced tunnel boring machines on the Central Secretariat – Badarpur Corridor of Delhi MRTS | ITD-ITD CEM JV | Delhi | Bricks;Yamuna San; Filling Sand; Sand Coarse | 1 | ||
2 | The Design & Construction of two underground Stations and tunnel between New Delhi Station and Talkatora Garden"AMEL-C1'. | Alpine Samsung HCC JV | Delhi | WMM | 0.2 | ||
CIVIL WORKS | |||||||
S.no | Project | Client | location | Nature of work | Price | Duration | Year of Commencement |
1 | Jaypee Sprots City | JaiPrakash Associated Ltd. | Noida(U.P.) | Demarcation of plots in plotted devlopement area in Jaypee Sports City | 0.6 | 1 Month | 2011 |
2 | Jaypee Sprots City | JaiPrakash Associated Ltd. | Noida(U.P.) | Laying & Fixing of Kerb Stone and Grasscrete in Jaypee Sports City | 0.4 | 2 Months | 2012 |
Neelkanth Contruction Private Limited Summary of Ongoing Works | |||||||
DEEP EXCAVATION | |||||||
S.no | Project | Client | location | Nature of work | Contract Value (millions) | Contract Duration | Year of Commencement |
1 | Design and Construction of Tunnel by shield TBM tunnel Stations and Ramp by cut and cover method at Naraina(CC-20) and 4 other Underground Station(CC-24) | J. Kumar Infraprojects Ltd. | Delhi | Excation work at Asharam site CC- 24 | - | 12 Months | 2015 |
2 | Design and Construction of Tunnel by shield TBM tunnel Stations and Ramp by cut and cover method at Naraina(CC-20) and 4 other Underground Station(CC-24) | J. Kumar Infraprojects Ltd. | Delhi | Excation work at Lajpat Nagar Site CC-24 | - | 4 Months | 2015 |
3 | Design and Construction of Tunnel by shield TBM between Chandpole & Badi Chauper, and two underground stations | CEC Ltd, Taiwan | Jaipur | Excation work at Chhoti and Badi Chauper | 50 | 12 Months | 2015 |
HIRING | |||||||
S.no | Project | Client | location | Name of Machinery | |||
1 | Construction of PWD Signal Free Corridor from Mukarba chowk to Wazirabad | CEC Ltd, Taiwan | Delhi | 6 tippers and excavator | |||